Aluminium Roof Halter RFQ: Drawings and Order Details
An RFQ field sheet for under-panel aluminium halters: height, base plate, slots, material, isolation pad and roof system interface.
An aluminium halter quote needs its own dimensioned drawing; an above-seam clamp drawing or photograph cannot substitute for it.
Name the part that sits below the sheet.
Halter, clip and bracket names vary. Define the part by position, drawing and function so that suppliers do not quote an external clamp by mistake.
Details a halter RFQ requires
- Halter height, base plate size and thickness.
- Slot or hole positions and fixing centres.
- Alloy, temper and surface treatment required.
- Isolation layer between dissimilar metals.
- Interface with the roof system and supporting structure.
- Quantity per area and the project drawing reference.
Halter RFQ field sheet
| Field | Buyer provides | Supplier states |
|---|---|---|
| Position | under-panel | Part offered |
| Height / base | dimensions + thickness | Offered size |
| Slots / holes | positions + centres | Offered detail |
| Material | alloy + finish | Offered grade |
| Isolation | required layer | Included / not |
| System interface | drawing reference | Compatibility basis |
Details suppliers often ask back.
- Using a clamp drawing as the halter specification.
- Omitting the isolation layer between metals.
- Not stating fixing centres.
- Assuming a halter is a standard accessory in every roof system.
A below-panel halter is sourced from its own drawing.
An under-panel aluminium halter needs a profile drawing, height, base plate, fixing method and project requirements. A clamp photograph is not evidence for a halter.
Record these before you request a price.
Swipe the table sideways to view all columns on a phone.
| Field | Your entry | Supplier returns |
|---|---|---|
| Profile drawing | revision + section | halter section offered |
| Height | specified mm | height offered |
| Base | plate + slots | base offered |
| Fixing | method + fasteners | fixing offered |
| Project need | roof system + qty | suitability note |
A few points that come up often.
Can a clamp photo be used for a halter?
No. A halter supports the sheet below; source it from its own drawing.
Is isolation included?
An isolation pad may be needed; confirm it as a separate line.
Who confirms the roof interface?
The project designer or installer; we record the profile offered.
A clearer path from
your plans to your materials.
Tell us what you need, where it is going and when.