Building Materials Quotation Template and RFQ Checklist
A building materials quotation template and RFQ checklist you can copy. List specifications, quantities, finish, destination and documents so every supplier quotes on the same basis.
A complete RFQ states scope, specification, quantity, delivery place and documents in one file that every supplier answers on the same basis.
Use one template for every supplier.
An RFQ that omits delivery terms or document requirements produces offers that cannot be compared. Fill the template once and send the same version to each supplier.
Sections the template must contain
- Buyer and project reference, without unnecessary personal data.
- Product scope, item numbers and quantities.
- Specification, drawings and finish references.
- Delivery destination, required date and quoted trade term.
- Documents required with the offer and with the goods.
- Validity period and the date by which questions are accepted.
RFQ header and line-item fields
| Section | Field | Example entry |
|---|---|---|
| Header | project + revision | project reference / rev A |
| Scope | item numbers | D-01, P-02 |
| Specification | drawing + finish | drawing ref + finish sample |
| Quantity | units + tolerance basis | qty + basis |
| Delivery | place + term + date | city + FOB/CIF/DDP to confirm |
| Documents | list by name | named files |
| Validity | offer validity | stated by supplier |
Details suppliers often ask back.
- Sending different versions to different suppliers.
- Omitting the destination or the named place for delivery terms.
- Not defining which documents must accompany the offer.
- Leaving the validity period undefined.
Frequently asked questions
Is the CSV template a real file?
Yes. A downloadable CSV with these fields is published with this guide and can be opened in a spreadsheet.
Does the RFQ create an order?
No. It is a request for comparable offers. Nothing is binding until the parties agree the written order.
A building-materials RFQ with the fields that matter.
Send one template that carries the door schedule, quantities, finishes, drawing revision, delivery place and required documents so suppliers return comparable lines.
Record these before you request a price.
Swipe the table sideways to view all columns on a phone.
| RFQ field | Your entry | Supplier returns |
|---|---|---|
| Door / item schedule | ref + size + handing + qty | items offered |
| Quantity | per item + total | price basis |
| Finish | reference + sample id | finish offered |
| Drawing | revision + date | drawing used |
| Delivery place | named port or place | term offered |
| Documents | named list | provided / missing |
A few points that come up often.
Should I send a draft or a frozen RFQ?
Mark which drawing revision the price is based on, so later changes can be handled as revisions.
Do I need to list every document?
Name the documents your destination and project require; suppliers can only confirm what exists.
Is there a downloadable template?
Yes, the CSV template bundled with this guide lists the same fields.
A door & hardware schedule you can fill in.
A building-materials RFQ is stronger when the schedule travels with it. This tool carries opening IDs, sizes, frames, handing, hardware sets, finishes, drawing revision and required documents on one row per door.
Record these before you ask for a price.
Swipe the table sideways to view all columns on a phone.
| Field | SAMPLE entry | Your entry |
|---|---|---|
| Opening ID | D-01 | one row per opening |
| Leaf size | 900 x 2100 mm | offered size |
| Frame / wall | FR-02 rev B / 150 mm | suitability note |
| Handing | left hand inswing | confirmed |
| Hardware set | lock + 3 hinges + closer | items offered |
| Finish / sample | BRUSHED SS 304 / SMP-014 | matched |
| Drawing revision | rev C dated 2026-11-18 | revision used |
| Documents | data sheet + test report | provided / missing |
Download the Door & Hardware Schedule. The XLSX has a Door Schedule sheet and a linked Hardware Items sheet; the CSV is the original single-file version.
Download Door & Hardware Schedule (XLSX) | Download CSV version
The CSV carries a single SAMPLE row for illustration; it is not a real order.
A few points that come up often.
Is there a standard door schedule?
No. Build one that reflects your openings and required documents.
Do I need to fix the drawing revision?
Yes. Reference the revision in the RFQ so later changes are traceable.
Does the CSV contain a real order?
No. The sample row is illustrative and must be replaced.
When a specified item cannot be supplied.
If a buyer-named model is unavailable, compare the alternative as a deviation rather than a like-for-like swap. Record material, size, finish, function, accessory and document differences and obtain written approval before the order changes.
Record these before you ask for a price.
Swipe the table sideways to view all columns on a phone.
| Field | SAMPLE entry | Status |
|---|---|---|
| Original model | LOCK-A rev2 | unavailable |
| Proposed alternative | LOCK-B rev1 | offered |
| Deviations | finish + backset differ | listed |
| Evidence | data sheet + sample | provided / missing |
| Impact | price / packing / lead note | recorded |
| Approval | buyer sign-off | pending |
Approval must reference the replacement drawing or PO version; no universal tolerance is implied.
A few points that come up often.
Can a supplier substitute without approval?
No. Record the differences and get the buyer to approve in writing.
What counts as a deviation?
Any change in material, size, finish, function, accessory or document that was specified.
Does this promise a shorter lead time?
No. No lead time is assumed; the supplier states it per offer.