CHINA SOURCING · BUILDING & RENOVATION MATERIALS+8618080921770WhatsApp ↗[email protected] ↗
Buying guide

Approving a Door Sample Before a Bulk Order

A door sample approval record covering sample number, finish, construction, hardware and approved version.

A door sample approval should identify one numbered sample, the exact finish and construction, and the version that is approved.

THE SHORT ANSWER

An approved sample is a reference, not a general description.

Record which sample was approved, what was checked, and what may not be changed without a new approval. This prevents a later batch from being judged against a vague colour name.

WHAT TO CHECK

What to record with the sample

  • A unique sample number linked to the supplier and date.
  • Leaf and frame construction visible or declared in the sample.
  • Finish reference and which face was inspected.
  • Hardware shown on the sample and whether it is in the bulk scope.
  • The agreed light condition and viewing distance for finish review.
  • Which changes require a new sample and re-approval.
A WORKING CHECKLIST

Door sample approval record

FieldRecordWhy it matters
Sample numberunique ID + dateVersion traceability
Constructioncore / face / edgeBulk build basis
Finishreference + faceAppearance approval
Hardwareitems shownScope clarity
Review conditionlight + distanceRepeatable judgement
Change rulere-approval triggerAvoid silent changes
COMMONLY LEFT OUT

Details suppliers often ask back.

  • Approving by colour name alone without a numbered reference.
  • Ignoring visible face differences between sample and production batch.
  • Assuming the sample hardware is included in the bulk price.
  • Losing the link between the approved sample and the order.
LET’S START WITH YOUR LIST

A clearer path from
your plans to your materials.

Tell us what you need, where it is going and when.

Send a sourcing request
WhatsApp ↗