Glass Thickness and Fitting Sequence: An Ordering Rule
Why glass build-up is fixed before the fitting and how to freeze the cut-out drawing revision.
Changing a fitting after glass is cut creates avoidable waste.
DECISION FIRST
Fix the glass build-up, then the fitting, then the drawing revision.
The cut-out belongs to a specific fitting and a specific glass build-up. Confirm the revision with both parties before processing.
STEPS TO TAKE
A short sequence that works.
- Agree glass thickness and layers with the glass supplier.
- Select the fitting model and obtain its cut-out drawing.
- Mark hole positions and edge distances.
- Name the approving party and date the revision.
- Release processing only after both parties confirm.
WORKING TABLE
Fill this before you enquire.
| Field | Your entry | Supplier returns |
|---|---|---|
| Glass | thickness + layers | glass basis |
| Fitting | supplier + model | model offered |
| Drawing | revision + date | drawing used |
| Holes | positions + sizes | confirmed sizes |
| Release | name + date | release note |
About this checklist. The enquiry method follows the sourcing and inspection guidance in the cited reference. The fields above are the information a supplier needs to return a comparable answer. Read the reference.
LET’S START WITH YOUR LISTA clearer path from
Send a sourcing requestA clearer path from
your plans to your materials.
Tell us what you need, where it is going and when.