Buying guide
Inspection Stage Choice: PPI, During Production or Pre-Shipment
How a buyer chooses between pre-production, during-production and pre-shipment checks.
Different inspection stages answer different questions; one stage does not replace the others.
DECISION FIRST
Choose the stage by the failure you are trying to catch.
Pre-production checks inputs, during-production checks the running process, pre-shipment checks finished goods and packing. Ask what each check covers before buying it.
STEPS TO TAKE
A short sequence that works.
- Define the risk: wrong input, process drift or finished-goods defect.
- Match the stage to that risk.
- Ask for the check list used at that stage.
- Record who closes any exception.
- Keep the report linked to the item number.
WORKING TABLE
Fill this before you enquire.
| Field | Your entry | Supplier returns |
|---|---|---|
| Risk | input / process / finished | stage proposed |
| Stage | PPI / DPI / PSI | scope offered |
| Checklist | named items | list provided |
| Exception | named owner | closed / open |
| Report | item reference | report linked |
About this checklist. The enquiry method follows the sourcing and inspection guidance in the cited reference. The fields above are the information a supplier needs to return a comparable answer. Read the reference.
LET’S START WITH YOUR LISTA clearer path from
Send a sourcing requestA clearer path from
your plans to your materials.
Tell us what you need, where it is going and when.