Sample Approval & Change Log
For: Buyers approving samples and managing revisions.
Separate approvals and change records linked by Item ID, Sample ID and drawing revision, with both parties’ confirmation.
How to mark finish direction on sheet drawings and confirm it on samples and delivered panels.
A directional finish needs an arrow on the drawing and an agreed review condition, not only a finish name.
Brushed and similar finishes can look different when panels are rotated. Mark the direction on each part and record the review condition.
| Part | Finish ref | Direction | Visible face |
|---|---|---|---|
| P-01 | sample ID | arrow on drawing | face A |
| P-02 | sample ID | arrow on drawing | face A |
Decorative stainless can differ between a sample and delivered panels. Record the finish reference, grain direction, batch and the approved sample together.
Swipe the table sideways to view all columns on a phone.
| Field | Your entry | Supplier returns |
|---|---|---|
| Finish reference | named + sample id | finish offered |
| Grain direction | marked on drawing | direction confirmed |
| Batch | lot / production run | batch offered |
| Approved sample | reference + date | matched / differs |
| Deviation | action if different | agreed in writing |
No. Confirm against an approved physical sample and record any deviation by batch.
A changed direction alters appearance even when the finish name is the same.
Name the approving party and keep the reference with the order.
For panels and trims, record which surfaces are visible, which are hidden, and where protection film, folded edges and joints are acceptable. A simple labelled legend on the drawing prevents a finish being expected where it was never specified.
Swipe the table sideways to view all columns on a phone.
| Face | SAMPLE entry | Requirement |
|---|---|---|
| Face A | front visible | same finish + grain |
| Face B | return visible | same finish |
| Face C | hidden back | as agreed |
| Protection film | front only | removal by installer |
| Folded edge | external fold visible | finish required |
| Joint location | at panel seam | appearance agreed |
| Drawing revision | rev C | frozen |
Only the faces marked as visible or agreed; hidden faces can differ.
A simple diagram may be used and must be labelled 示意 / illustrative.
Agree the party and record it on the drawing.
For: Buyers approving samples and managing revisions.
Separate approvals and change records linked by Item ID, Sample ID and drawing revision, with both parties’ confirmation.
Need help filling one in? Send your materials list through our existing inquiry form and describe what you are buying. No file upload is required in the form; attachments are handled by email if needed.
Tell us what you need, where it is going and when.