Trim Profile Revision Control: An Ordering Rule
How to keep section drawings, finish references and order quantities on one revision.
A profile ordered against an old revision will not match the approved sample.
Freeze a single revision for the section, finish and quantity list.
Give each profile a number and keep the drawing, finish reference and quantity on the same revision date.
A short sequence that works.
- Assign a unique profile number.
- Attach the section drawing with a revision.
- State finished and developed dimensions.
- Record finish reference and direction.
- Issue one quantity list against that revision.
Fill this before you enquire.
| Field | Your entry | Supplier returns |
|---|---|---|
| Profile | number + revision | section offered |
| Dimensions | finished / developed | values used |
| Finish | reference + direction | finish offered |
| Quantity | list revision | unit basis |
| Film | protection requirement | film offered |
About this checklist. The enquiry method follows the sourcing and inspection guidance in the cited reference. The fields above are the information a supplier needs to return a comparable answer. Read the reference.
What a quantity or size change does to a quote.
A revision to dimensions, quantity or finish can change price and validity. Record the revision and ask for written confirmation before production.
Record these before you request a price.
Swipe the table sideways to view all columns on a phone.
| Change | Your entry | Supplier returns |
|---|---|---|
| Revision | drawing id + date | revision used |
| Size change | old -> new dimension | impact on price |
| Quantity change | old -> new qty | new price basis |
| Reprice | yes / no | confirmed / pending |
| Validity | quote valid until | period stated |
A few points that come up often.
When must a quote be reconfirmed?
When size, quantity, finish or delivery changes; get the new basis in writing.
How long is a quote valid?
Ask for the validity period; it is not automatic.
Can changes be absorbed silently?
Do not assume so; every change should reference a revision and a confirmed price.