CHINA SOURCING · BUILDING & RENOVATION MATERIALS+8618080921770WhatsApp ↗[email protected] ↗
Buying guide

Supplier Comparison Sheet: A Repeatable Format

A repeatable comparison sheet for supplier offers that keeps scope, evidence and terms separate.

Supplier offers cannot be ranked by price alone when scope and evidence differ.

DECISION FIRST

Compare scope first, evidence second, price third.

Use the same fields for every offer and record missing items rather than guessing them.

STEPS TO TAKE

A short sequence that works.

  1. Normalise the item numbers.
  2. Mark included and excluded items.
  3. List the documents actually received.
  4. Record delivery place and term.
  5. Only then compare the price basis.
WORKING TABLE

Fill this before you enquire.

FieldYour entrySupplier returns
Itembuyer referencesupplier item
Scopeincluded / excludedmarked scope
Evidencenamed documentsreceived files
Deliveryplace + termterm offered
Pricebasis + validityunit / total

About this checklist. The enquiry method follows the sourcing and inspection guidance in the cited reference. The fields above are the information a supplier needs to return a comparable answer. Read the reference.

COMPARE THE FULL LINE

Normalise scope, unit, packing and documents before price.

A lower unit price is not the lower cost when packing, transport or documents differ. Put each offer through the same rows.

WORKING FIELDS

Record these before you request a price.

Swipe the table sideways to view all columns on a phone.

Comparison rowOffer AOffer B
Product scopeitems includeditems included
Uniteach / set / m2each / set / m2
Packingper carton + methodper carton + method
Transportnamed place + termnamed place + term
Documentsnamed listnamed list
Price basisquantity + validityquantity + validity
QUESTIONS BUYERS ASK

A few points that come up often.

Do I just compare the lowest unit price?

No. Align scope, unit, packing, transport and documents first, then compare.

How long is a price valid?

Ask for the validity period in writing; material and freight quotes can change.

Who confirms compliance documents?

The responsible party for your destination; we record which documents the supplier returns.

DOWNLOADABLE TOOL

Compare supplier quotations on scope, not just unit price.

Normalise scope, unit, quantity, packaging, trade term, named place, freight, documents and validity before comparing prices. Unknown costs stay "to be confirmed" and currencies are never summed together.

WORKING FIELDS

Record these before you ask for a price.

Swipe the table sideways to view all columns on a phone.

RowSAMPLE entryRule
CurrencyUSDnever sum different currencies
Unit / scopeper set; hinges + handlesalign before comparing
Unit priceUSD 4.50 / setwrite currency explicitly
Packingper 50 sets cartonmethod + per-carton qty
Trade term / placeFOB Shenzhenterm plus named place
Freight / insuranceto be confirmedunknown is not 0

Use one row per quotation line with an Item ID and Supplier ID. The XLSX and CSV have the same fields; no formulas are used.

Download Supplier Quotation Comparison (XLSX) | Download CSV version

SAMPLE row only. This is a comparison worksheet, not a quotation.

QUESTIONS BUYERS ASK

A few points that come up often.

Can I add up prices in two currencies?

No. Convert with an agreed rate first, or compare within one currency.

What if a cost is unknown?

Write "to be confirmed"; do not enter 0 as a placeholder.

What sets a quotation validity?

The supplier states it in writing; record the date and reference.

LET’S START WITH YOUR LIST

A clearer path from
your plans to your materials.

Tell us what you need, where it is going and when.

Send a sourcing request
WhatsApp ↗