Buying guide
Wooden Door Core Schedule: What to Record Before Quoting
A wooden door core schedule that separates leaf construction, face material and edge detail before a quote is requested.
A core description on its own does not produce comparable wooden door quotes.
DECISION FIRST
Record construction as separate fields, not as a marketing name.
Ask each supplier to state what is offered for the exact door type. Identify how the construction will appear on the drawing and on delivered labels.
STEPS TO TAKE
A short sequence that works.
- Give each opening a reference and quantity.
- State the leaf construction you require or invite a proposal.
- Name the visible face material and edge treatment.
- Ask which documents support the stated construction.
- Agree what triggers re-approval if anything changes.
WORKING TABLE
Fill this before you enquire.
| Field | Your entry | Supplier returns |
|---|---|---|
| Opening | D-01, quantity | quoted item |
| Core | required or to propose | construction offered |
| Face | visible material | face offered |
| Edge | edge detail | edge method |
| Documents | named list | files provided |
About this checklist. The enquiry method follows the sourcing and inspection guidance in the cited reference. The fields above are the information a supplier needs to return a comparable answer. Read the reference.
LET’S START WITH YOUR LISTA clearer path from
Send a sourcing requestA clearer path from
your plans to your materials.
Tell us what you need, where it is going and when.